The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS KETERCAPAIAN PENGUPASAN OVERBURDEN DI PIT LAWAI 1, PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN

Text

ANALISIS KETERCAPAIAN PENGUPASAN OVERBURDEN DI PIT LAWAI 1, PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN

Amin, Muhamad Al - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Budi Gema Gempita is a mining company located in Lahat Regency, South Sumatra Province. The open pit mining method is carried out in strip mining with a combination of shovels and trucks. The overburden stripping target at Lawai 1 Pit in January 2021 was 75,000 BCM, but the planned stripping target was not achieved. Realization of overburden stripping was 55,760 BCM or around 74%. Failure to achieve the overburden stripping target needs to be minimized by conducting an analysis of the planned overburden stripping target. This study compares between actual calculations in the field and theoretical. This study aims to analyze why the unachieved stripping occurs and the factors causing the unachieved overburden stripping so that efforts can be made to minimize the unattained overburden stripping in January 2021. The results showed that the main factor in not achieving the overburden stripping target was due to the effect of effective working time. Therefore, it is necessary to improve the effective working time so that overburden removal increases to 105% of the given target.


Availability
Inventory Code Barcode Call Number Location Status
2307001344T91461T914612023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T914612023
Publisher
Inderalaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xv, 23 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.507
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
drainase pertambangan
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
SEPTA
Other version/related

No other version available

File Attachment
  • ANALISIS KETERCAPAIAN PENGUPASAN OVERBURDEN DI PIT LAWAI 1, PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search