The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PENERAPAN VALUE ENGINEERING PADA PERENCANAAN FLY OVER SEKIP UJUNG KOTA PALEMBANG

Text

PENERAPAN VALUE ENGINEERING PADA PERENCANAAN FLY OVER SEKIP UJUNG KOTA PALEMBANG

Putri, N Karina Zulkarnain - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Traffic often occurs at Sekip Ujung intersection due to the increasing volume of vehicles in Palembang, Sumatera Selatan. Based on a survey conducted in 2019 and analyzed by traffic engineers, it is known that in 2020, Jalan R. Sukamto and Jalan Jenderal Basuki Rahmat will be having a volume capacity ratio (VCR) above 80%. With the growth in Palembang city, it is assumed that the projected traffic growth is 3,65% per year. So one of the solution for decreasing the high volume of traffic in Palembang is by constructing a fly over in the Sekip Ujung area. The implementation of construction project is closely related to the management process in it. At this stage, budget management for the implementation of the work must be planned and structured in such a way that it relies on a structured estimation concept to achieve an economically significant design estimate. Value engineering is a planned approach with the aim of identifying and streamlining unnecessary costs. This study aims to find out how much the cost savings are obtained after selecting scenarios from several selected alternatives after value engineering has been carried out using the multi criteria analysis method. To determine the criteria and weight of each alternative, several criteria are determined, namely; travel time, environmental impact after construction, land acquisition, and construction time and cost. The results obtained from these 4 scenarios are the 2nd scenario, which has the highest performance with a score of 87, the lowest construction cost of 156 Billion Rupiah, and a life cycle cost of 209 Billion Rupiah.


Availability
Inventory Code Barcode Call Number Location Status
2307000304T89404T894042023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T894042023
Publisher
Inderalaya : Prodi Teknik Sipil, Fakultas Tenik., 2022
Collation
xv, 44 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
625.707
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Jalan raya
Prodi Teknik Sipil
Specific Detail Info
-
Statement of Responsibility
SEPTA
Other version/related

No other version available

File Attachment
  • PENERAPAN VALUE ENGINEERING PADA PERENCANAAN FLY OVER SEKIP UJUNG KOTA PALEMBANG
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search