Image of ANALISIS PERCEPATAN DURASI PROYEK MENGGUNAKAN METODE CRASHING PADA PROYEK PEMBANGUNAN GEDUNG (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG MAPOLDA SUMATERA SELATAN)

Text

ANALISIS PERCEPATAN DURASI PROYEK MENGGUNAKAN METODE CRASHING PADA PROYEK PEMBANGUNAN GEDUNG (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG MAPOLDA SUMATERA SELATAN)

Malahayati, Malahayati - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Construction projects tend to experience delays, where there is a discrepancy between the planned schedule and the actual schedule. In an effort to overcome delays in the implementation of construction projects, project acceleration is carried out using the crashing method with the aim of knowing more efficient project durations at optimal costs. In this study, acceleration of project duration was carried out using the crashing method on the South Sumatra Police Headquarters building construction project because until the 12th week out of a total of 21 work weeks there was a delay with a deviation of 9.8592%, so crashing was carried out with an overtime scenario of 1 hour, 2 hours, 3 hours. hours and 4 hours. Based on the analysis that has been carried out where 1 hour of overtime causes the duration to be 56 days or 8.197% faster than the normal duration with a total cost of Rp. 17,948,240,706.00 or 0.021% more efficient than the normal total cost, 2 hours overtime causes the duration of the project to be 54 days or 11.475% faster than the normal duration with a total cost of Rp. 17,955,223,484.78 or 0.017% more expensive than the normal total cost, 3 hours overtime causes the duration to be 53 days or 13.115% faster than the normal duration with a total cost of Rp. 17,960,240,875.63 or 0.045% more expensive than the normal cost and 4 hours of overtime causes the duration of the project to be 51 days or 16.393% faster than the normal duration with a total cost of Rp. 18,017,220,228.36 or 0.363% more expensive than the normal fee. It can be concluded based on the analysis that has been carried out where 1 hour overtime is an alternative to accelerating project duration that is more efficient at optimal costs because the duration is 8.197% faster than the normal project duration and the total cost is 0.021% more efficient than the normal total project cost.


Availability
Inventory Code Barcode Call Number Location Status
2307000335T88509T885092023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T885092023
Publisher
Inderalaya : Prodi Teknik Sipil, Fakultas Tenik., 2023
Collation
xx, 282 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
725.107
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Prodi Teknik Sipil
arsitektur gedung kemiliteran dan kepolisian
Specific Detail Info
-
Statement of Responsibility
SEPTA
Other version/related

No other version available

File Attachment
  • ANALISIS PERCEPATAN DURASI PROYEK MENGGUNAKAN METODE CRASHING PADA PROYEK PEMBANGUNAN GEDUNG (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG MAPOLDA SUMATERA SELATAN)
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search