The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN SISTEM PENYALIRAN TAMBANG BATUBARA DI PT ANUGERAH COVINDO INDONESIA JOB SITE PT BANJARSARI PRIBUMI KABUPATEN LAHAT SUMATERA SELATAN

Text

PERENCANAAN SISTEM PENYALIRAN TAMBANG BATUBARA DI PT ANUGERAH COVINDO INDONESIA JOB SITE PT BANJARSARI PRIBUMI KABUPATEN LAHAT SUMATERA SELATAN

Samudra, Samudra - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

The open pit mining method applied to coal mining at PT Anugerah Covindo Indonesia has resulted in the formation of basins that have the potential to collect rainwater and groundwater. Water entering the mine forms puddles which disrupt the production process because there is no sump to control the water. Mine drainage system planning needs to be done to overcome the problems that exist at PT Anugerah Covindo Indonesia. This study aims to determine the total discharge of water entering the pit, analyze and design ideal sump dimensions, design pump requirements, and analyze and design settling pond dimensions. In this research, observations, calculations, and analyzes were carried out on rainfall data, catchment area, and total discharge of water entering and leaving the mine so that an ideal mine drainage system was obtained. Based on the research results, it was found that the total incoming water debit was 6,119.04 m3/day with a catchment area of 24.788 ha. The sump design is in the form of a truncated pyramid with an upper side length of 65 m and a lower side length of 55 m with a depth of 5 m which has a wall slope of 45° so that it has a volume of 18,041 m3. The pumping capacity is 6,1190.4 m3/day which will be pumped by 2 pump units which require a power of 44,791 kW. There are 6 settling pond compartments with a top side length of 30 m, a top width of 16 m, a bottom side length of 24 m, a bottom side width of 9 m with a depth of 3 m, and a wall slope of 45° so that each compartment has a volume of 1,059.41 m3 with a total volume 6,356.47 m3


Availability
Inventory Code Barcode Call Number Location Status
2307002771T121930T1219302023Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T1219302023
Publisher
Inderalaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2023
Collation
xvi, 47 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.307
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Tambang Batu Bara
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
SEPTA
Other version/related

No other version available

File Attachment
  • Mengambil data. Tunggu beberapa detik dan cobalah memotong atau menyalin lagi.
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search