The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS KELAYAKAN NILAI INVESTASI KONTRAK KERJA BUILD OPERATE TRANSFER (Studi Kasus Proyek Revitalisasi Kawasan GOR Palembang)

Skripsi

ANALISIS KELAYAKAN NILAI INVESTASI KONTRAK KERJA BUILD OPERATE TRANSFER (Studi Kasus Proyek Revitalisasi Kawasan GOR Palembang)

Febrika, Dian - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

One program that will be realized by the provincial govemment of South Sumatra, South Sumatra election in order to host the SEA Games XXVI on 2011 namely revitalization of Campus Sport Building of Palembang. Government in collaboration with the private sector to revitalize the area into Palembang Sport and Convention Center (PSCC), hotel and town square. This partnership uses a system of Build Operate Transfer (BOT) during the period of 28 years. Feasibility study reviewed the financial aspects need to be conducted to determine the BOT project is feasible or not to be implemented. The purpose of this study is to find description of Build Operate Transfer and provides an altemative feasibility study to determine the financial aspect was appropriate or not BOT system in terms of govemment and investors. The method used in this research is through the analysis of Net Present Value (NPV), Internal Rate of Retum (IRR) and Payback Period (PP). Data required to support this research derived from relevant agencies ie departement of PU Cipta Karya of South Sumatra Province. Financial analysis of contract of B.O.T at interest rate level of 15% per year its obtained Net Present Value (NPV) = + Rp.38.596.602.241,79, value of IRR was equal to 18,34% and investment payback period is 13,28 years during which period investment of 28 years. Because the NPV i s positive, the IRR value is greater than value at interest rate level of 15% per year and repayment period not exceeding the time limit of investment, thus the investment project is feasible.


Availability
Inventory Code Barcode Call Number Location Status
1107000363T98820T988202010Central Library (REFERENCES)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T988202010
Publisher
Inderalaya : Prodi Teknik Sipil, Fakultas Teknik Universitas Sriwijaya., 2010
Collation
x, 59 hlm.; ill.; tab.; 28 cm.
Language
Indonesia
ISBN/ISSN
-
Classification
692.507
Content Type
Text
Media Type
unmediated
Carrier Type
unspecified
Edition
-
Subject(s)
Tenaga kerja
Prodi Teknik Sipil
Specific Detail Info
-
Statement of Responsibility
Furika
Other version/related

No other version available

File Attachment
  • ANALISIS KELAYAKAN NILAI INVESTASI KONTRAK KERJA BUILD OPERATE TRANSFER (Studi Kasus Proyek Revitalisasi Kawasan GOR Palembang)
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search