Skripsi
ANALISIS KELAYAKAN NILAI INVESTASI KONTRAK KERJA BUILD OPERATE TRANSFER (Studi Kasus Proyek Revitalisasi Kawasan GOR Palembang)
One program that will be realized by the provincial govemment of South Sumatra, South Sumatra election in order to host the SEA Games XXVI on 2011 namely revitalization of Campus Sport Building of Palembang. Government in collaboration with the private sector to revitalize the area into Palembang Sport and Convention Center (PSCC), hotel and town square. This partnership uses a system of Build Operate Transfer (BOT) during the period of 28 years. Feasibility study reviewed the financial aspects need to be conducted to determine the BOT project is feasible or not to be implemented. The purpose of this study is to find description of Build Operate Transfer and provides an altemative feasibility study to determine the financial aspect was appropriate or not BOT system in terms of govemment and investors. The method used in this research is through the analysis of Net Present Value (NPV), Internal Rate of Retum (IRR) and Payback Period (PP). Data required to support this research derived from relevant agencies ie departement of PU Cipta Karya of South Sumatra Province. Financial analysis of contract of B.O.T at interest rate level of 15% per year its obtained Net Present Value (NPV) = + Rp.38.596.602.241,79, value of IRR was equal to 18,34% and investment payback period is 13,28 years during which period investment of 28 years. Because the NPV i s positive, the IRR value is greater than value at interest rate level of 15% per year and repayment period not exceeding the time limit of investment, thus the investment project is feasible.
Inventory Code | Barcode | Call Number | Location | Status |
---|---|---|---|---|
1107000363 | T98820 | T988202010 | Central Library (REFERENCES) | Available but not for loan - Not for Loan |
No other version available