The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN TEMPAT PENAMPUNGAN SEMENTARA SAMPAH 3R DI KECAMATAN MUARA BELITI KABUPATEN MUSI RAWAS.		03011181823006

Skripsi

PERENCANAAN TEMPAT PENAMPUNGAN SEMENTARA SAMPAH 3R DI KECAMATAN MUARA BELITI KABUPATEN MUSI RAWAS. 03011181823006

Ramadhania, Mutiara Dita - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

Waste problems arise due to improper waste management, especially in Indonesia. Every day, Indonesia produces tens of tons of waste, one of which is in Muara Beliti sub-district, Musi Rawas district. Muara Beliti sub-district is the center of the district capital with a total population of 26,450 people, which with the increasing number of residents and increasing human activities, the more waste will be generated in the area.Garbage is not only generated from public facilities, but also from community settlements. From this research, it is planned to build a 3R TPS to minimize the burden of waste in the TPA and this is expected to be a solution, so that the waste can be managed properly. This research was investigated by calculating the amount of waste generation, waste density, waste composition and projecting the population to plan 3R TPS for the next 10 years. From the results of this study, the average waste generation was 0.63 kg/person/day, the average waste density was 0.32 kg/m^3, the volume of waste was 58.13 m^3/day, the amount of waste generated was 18.603 kg/day or 18 ,60 tons/day so that the composition of waste that can be recycled is 78.13% and the composition of waste that will be taken to the TPA is 21.63%. From the calculated data, a 3R TPS is planned with a required area of 3393 m2, a loading and unloading area of 18 m2, a sorting area of 24 m2, a composting area of m2, an enumeration area of 23 m2, a compost storage area of 1400 m2. , plastic storage area 27 m2, paper storage area 3 m2, metal and glass storage area 1 m2, arm roll rotation 2 rit/day, the number of arm rolls used is 5 arm rolls with a container capacity of 3.84 tons/day and it takes 5 containers, and obtained from the calculation of the rough estimated price (HPK) of Rp. 1,950,000,000.00


Availability
Inventory Code Barcode Call Number Location Status
2207000399T64386T643862022Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T643862022
Publisher
Indralaya : Prodi Teknik Sipil, Fakultas Teknik Universitas Sriwijaya., 2022
Collation
xv, 44 hlm.: ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
628.407
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik Sipil
Teknik Sanitasi Umum, Penampungan Sampah
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • PERENCANAAN TEMPAT PENAMPUNGAN SEMENTARA SAMPAH 3R DI KECAMATAN MUARA BELITI KABUPATEN MUSI RAWAS.
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search