The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of REDESAIN RANCANGAN ULTIMATE PIT LIMIT BERDASARKAN PERUBAHAN HARGA BATUBARA MENGGUNAKAN APLIKASI MINESCAPE 5.7 DI PIT ABIMANYU PT. PUTRA MUBA COAL, KECAMATAN SUNGAI LILIN, KABUPATEN MUSI BANYUASIN, PROVINSI SUMATERA SELATAN

Skripsi

REDESAIN RANCANGAN ULTIMATE PIT LIMIT BERDASARKAN PERUBAHAN HARGA BATUBARA MENGGUNAKAN APLIKASI MINESCAPE 5.7 DI PIT ABIMANYU PT. PUTRA MUBA COAL, KECAMATAN SUNGAI LILIN, KABUPATEN MUSI BANYUASIN, PROVINSI SUMATERA SELATAN

Kurniawan, Roby - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

The Abimanyu pit is one of the pits located at PT. Putra Muba Coal had stopped mining in 2018 due to a significant decline in coal prices at that time so the mining process could not continue. In 2022, the movement of coal prices has increased again so that it is necessary to re-design the ultimate pit limit on the SR in accordance with the selling price so that the company has an alternative ultimate pit in several SR scenarios, namely 1.4; 1,2; and 0.7. Based on geotechnical recommendations from PT. PMC, the geometry of the planned single slope is a height of 6 meters, 45° for single slope, and the width of the slope is 3 meters with an overall slope of 32°. The results of the calculation of the mined reserves for the SR 1.4 pit design are 2,405,489.05 Tons of Coal and 3,414,776.02 Bcm Overburden and have a total area of 16.59 Ha with the maximum pit limit depth at an elevation of 38 meters below ground level. In the SR 1.2 pit design, the mined reserves are 2,304,319.35 Tons of Coal and 2,847,674.30 Bcm Overburden and have a total area of 15.85 Ha with the maximum pit limit depth at an elevation of 36 meters below ground level. . In the SR 0.7 pit design, the mined reserves are 1,356,484.07 Tons of Coal and 1,015,260.50 Bcm of Overburden and have a total area of 9.99 Ha with the maximum pit limit depth at an elevation of 24 meters below ground level.


Availability
Inventory Code Barcode Call Number Location Status
2207003384T77408T774082022Central LibraryAvailable
Detail Information
Series Title
-
Call Number
T774082022
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2022
Collation
xiv, 48 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.107
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
teknik pertambangan
Eksploitasi, Pit Limit
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • REDESAIN RANCANGAN ULTIMATE PIT LIMIT BERDASARKAN PERUBAHAN HARGA BATUBARA MENGGUNAKAN APLIKASI MINESCAPE 5.7 DI PIT ABIMANYU PT. PUTRA MUBA COAL, KECAMATAN SUNGAI LILIN, KABUPATEN MUSI BANYUASIN, PROVINSI SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search