The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN SISTEM PENYALIRAN TAMBANG UNTUK MENGATASI OVERLOAD PADA SUMP DI PIT A1 BIMA, PT. BIMA PUTRA ABADI CITRANUSA, LAHAT, SUMATERA SELATAN

Skripsi

PERENCANAAN SISTEM PENYALIRAN TAMBANG UNTUK MENGATASI OVERLOAD PADA SUMP DI PIT A1 BIMA, PT. BIMA PUTRA ABADI CITRANUSA, LAHAT, SUMATERA SELATAN

Harist, M. A. Rahman - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. Bima Putra Abadi Citranusa is a coal mining company in Lahat, South Sumatra that using open pit method. The current mining activity hampered because of overflowing sump so it is necessary to re-planning the drainage system. Based on the analysis amount of water entering the mine is 14.367,75 m3/day with a catchment area of 60.25Ha. The incoming water consists of runoff water of 14,393.88 m3/day, ground water of 66.3992 m3/day, and evapotranspiration of 92,13 m3/day. Based on the regulations in Kepmen 1827K the planned volume of sump is 45,258.50 m3. The planned sump has a surface dimension of 101m and a base of 91m. The pumping planned with 2 DND-150 pumps with a discharge of 462 m3/hour each, with 16 hours pumping time divided into 2 shifts and a total head of 71,651m with an efficiency approaching 75%. The open channel dimensions are 0.88m in surface width, 0.4m for flow depth, 0.46m for channel depth and the bottom surface width with the slope of the channel is 0.025%. The planned settling pond form is trapezoid with a rectangular base with a total volume of 7.183,879m3 divided into 6 compartments. The volume of each compartment is 1.198,313m3. The dimensions of the planned settling pond are 34m for the top width, 27m for the bottom width, 132m for the top length and 120m for the bottom length with the top and bottom widths of each compartment are 17m and 11m and the width of the insulation is 5m.


Availability
Inventory Code Barcode Call Number Location Status
2207002460T75141T751412022Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T751412022
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2022
Collation
xiv, 42 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.507
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
teknik pertambangan
drainase pertambangan
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • PERENCANAAN SISTEM PENYALIRAN TAMBANG UNTUK MENGATASI OVERLOAD PADA SUMP DI PIT A1 BIMA, PT. BIMA PUTRA ABADI CITRANUSA, LAHAT, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search