Skripsi
EVALUASI RUGI-RUGI DAYA DAN JATUH TEGANGAN PENYULANG SUNGKAI DI GARDU INDUK BUNGARAN PALEMBANG
The increasing number of human population day by day and of course the need for energy is also growing rapidly. Activities carried out by humans today cannot be separated from the use of sophisticated technology and the main source is electrical energy. In a distribution system, the quality of the system must be good. The electrical system between generating centers and load centers is separated by hundreds or thousands of kilometers. This very long distance will result in power losses. This research was conducted at the Sungkai Feeder at the Bungaran Palembang Substation with the aim of evaluating power losses and voltage drops. The data that has been collected, becomes the capital to perform calculations. Based on data processing, the sungkai feeder at the Bungaran Substation produces a total voltage drop of 0.19 kV with a percentage of 0.95%, and a total power loss of 11.9272 KW.
Inventory Code | Barcode | Call Number | Location | Status |
---|---|---|---|---|
2207000914 | T68740 | T687402022 | Central Library (Referens) | Available |
No other version available