PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA PADA KOMPLEK PERUMAHAN NASKAH INDAH II, KECAMATAN SUKARAMI PALEMBANG
PLTS was chosen because its utilization does not cause pollution that can Damaging the environment. There are two types of PLTS systems, namely, Off- Grid and On-Grid. The On-Grid system uses a circuit that is connected to the PLN network. Meanwhile, Off-Grid PLTS relies on solar energy as the only main energy source. Sunlight is a form of energy from natural resources. This solar natural resource has been widely used to supply electrical power in communication satellites through solar cells. The total load on this housing is 267.5 kWh, for the total cost of PLTS (25 years) = Initial investment + Additional operational costs + battery replacement for 25 years = Rp. 1,280,098,000,000 + Rp. 126,969,000 + Rp. 448,000,000 = Rp. 128,249,098,000 Based on the total cost of PLTS for 25 years, the annual costs obtained are: Total annual cost = Total cost of PV mini-grid (25 years) / 25 = Rp. 1,855,067,000. / 25 = Rp. 74,420,637. And the daily cost for using PLTS for 25 years is Rp. 74,420,637./ 365 = Rp.203,295.50. 1. In planning the PLTS in the beautiful script II housing complex, 175 500 Wp solar panels are used, 28 12 V 1000ah batteries, 7 5,000 Watt inverters, and 7 controllers. to reduce the use of fossil energy and minimize the increase in global warming due to excessive use of fossil energy. Because the solar power system does not require fuel at the time of operation, the resources for PLTS are abundant.
Inventory Code | Barcode | Call Number | Location | Status |
---|---|---|---|---|
2207000922 | T68755 | T687552022 | Central Library (Referens) | Available |
No other version available