The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA PADA KOMPLEK PERUMAHAN NASKAH INDAH II, KECAMATAN SUKARAMI PALEMBANG

Skripsi

PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA PADA KOMPLEK PERUMAHAN NASKAH INDAH II, KECAMATAN SUKARAMI PALEMBANG

Akbar, Ilyas Akmal - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PLTS was chosen because its utilization does not cause pollution that can Damaging the environment. There are two types of PLTS systems, namely, Off- Grid and On-Grid. The On-Grid system uses a circuit that is connected to the PLN network. Meanwhile, Off-Grid PLTS relies on solar energy as the only main energy source. Sunlight is a form of energy from natural resources. This solar natural resource has been widely used to supply electrical power in communication satellites through solar cells. The total load on this housing is 267.5 kWh, for the total cost of PLTS (25 years) = Initial investment + Additional operational costs + battery replacement for 25 years = Rp. 1,280,098,000,000 + Rp. 126,969,000 + Rp. 448,000,000 = Rp. 128,249,098,000 Based on the total cost of PLTS for 25 years, the annual costs obtained are: Total annual cost = Total cost of PV mini-grid (25 years) / 25 = Rp. 1,855,067,000. / 25 = Rp. 74,420,637. And the daily cost for using PLTS for 25 years is Rp. 74,420,637./ 365 = Rp.203,295.50. 1. In planning the PLTS in the beautiful script II housing complex, 175 500 Wp solar panels are used, 28 12 V 1000ah batteries, 7 5,000 Watt inverters, and 7 controllers. to reduce the use of fossil energy and minimize the increase in global warming due to excessive use of fossil energy. Because the solar power system does not require fuel at the time of operation, the resources for PLTS are abundant.


Availability
Inventory Code Barcode Call Number Location Status
2207000922T68755T687552022Central Library (Referens)Available
Detail Information
Series Title
-
Call Number
T687552022
Publisher
Indralaya : Prodi Teknik Elektro, Fakultas Teknik Universitas Sriwijaya ;., 2022
Collation
xvii, 31 hlm.; ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
621.313 07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Teknik elektro
Mesin Pembangkit dan Pengkonversi Listrik
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA PADA KOMPLEK PERUMAHAN NASKAH INDAH II, KECAMATAN SUKARAMI PALEMBANG
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search