PENINGKATAN SISTEM JARINGAN ZERO DOWN TIME MENGGUNAKAN DUA TRANSFORMATOR BERBEDA DI GARDU INDUK NEW JAKABARING.
This study discusses increasing Zero Down Time for the Jakabaring Sport City area which was initially only supplied from one transformer to two different transformers to supply a loop network system in the Jakabaring Sport City area which will be simulated using ETAP 19.0 software. Zero Down Time is the reconfiguration of the spindle network into a loop network. The protection system used is a closed loop network protection system where the line differential relay is the main protection and the overcurrent relay is the back up protection. Simulation has been carried out in ETAP 19.0 for the Single Line Diagram circuit in the Jakabaring Sport City area with two different feeders, the Sriwijaya Feeder and the Demak Feeder from Transformer 1 and Transformer 2 at the same Switchyard, the New Jakabaring’s Switchyard and it was found that the use of two transformers as supply to customers has a better level of reliability and customers will not experience blackouts
Inventory Code | Barcode | Call Number | Location | Status |
---|---|---|---|---|
2207003725 | T79224 | T792242022 | Central Library (Referens) | Available |
No other version available