The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of ANALISIS OVERALL EQUIPMENT EFFECTIVENESS (OEE) EXCAVATOR BACKHOE PADA PENGUPASAN OVERBURDEN DI PT TUNAS JAYA PERKASA PIT U2-10 KABUPATEN TANAH LAUT KALIMANTAN SELATAN

Skripsi

ANALISIS OVERALL EQUIPMENT EFFECTIVENESS (OEE) EXCAVATOR BACKHOE PADA PENGUPASAN OVERBURDEN DI PT TUNAS JAYA PERKASA PIT U2-10 KABUPATEN TANAH LAUT KALIMANTAN SELATAN

Parhusip, Antonius Perdhinando - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

The availability of tools and lost working time are the main issues for every mining company to improve the efficiency and performance of mining activities. Overall Equipment Effectiveness (OEE) is a metric for measuring the performance of equipment or a production system by measuring three main ratios, namely availability, performance, and quality. The analysis is carried out by detecting the factors that cause lost time and their effect on production time to detect an opportunity to increase equipment production. This study analyzes the performance of the tools used for mining operations at PT Tunas Jaya Perkasa Pit U2-10, namely the backhoe excavator which consists of 6 units, namely 2 Komatsu PC400 units, 2 Hitachi ZX470 units and 2 CAT349DL units. Data collection is done by direct observation of the time loss that occurs in each time component in the tool cycle time. Secondary data is taken from the fleet activity monitoring sheet by the Production Department and PT Tunas Jaya Perkasa Data Center.The final results obtained that the excavator backhoe OEE ratio of EX 810, EX 815, EX 851, EX 853, EX 856, EX 858 was 62.29%, respectively; 66.09%; 61.57%; 72.57%; 79.55%; 85.33% and after improvement it increased to 73.97%; 76.81%; 73.58%; 78.08%; 81.85%; and 88.54%. The biggest performance improvement opportunities are found in the availability and performance factors caused by equipment failure, idle time, weather, loading queue time, doing P2H and backhoe unproductive maneuvering time. Keywords: OEE, Availability, Performance, Quality, Excavator Backhoe, Time, Production


Availability
Inventory Code Barcode Call Number Location Status
2107004873T66712T667122021Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T667122021
Publisher
Indralaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2021
Collation
xv, 78 hlm.: ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.407
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Lingkungan Pertambangan
Prodi Teknik Pertambangan
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • ANALISIS OVERALL EQUIPMENT EFFECTIVENESS (OEE) EXCAVATOR BACKHOE PADA PENGUPASAN OVERBURDEN DI PT TUNAS JAYA PERKASA PIT U2-10 KABUPATEN TANAH LAUT KALIMANTAN SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search