The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of EVALUASI PELEPASAN BEBAN POWER PLANT B KAJI STATION PADA PT. MEDCO E&P RIMAU ASSET

Skripsi

EVALUASI PELEPASAN BEBAN POWER PLANT B KAJI STATION PADA PT. MEDCO E&P RIMAU ASSET

Shahab, Muhammad Raffi - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

The purpose of carrying out Load shedding is so that the electrical power supplied from the generator to the load is maintained in a safe condition and the generation system can run normally so that it does not experience a total blackout. Therefore, Load shedding is done to correct the unstable frequency. This problem is the reason I made a final project with the topic PLC-Based Load shedding at PT. Medco E&P Rimau Asset. The method in this research is literature study, interview, data collection, data processing and analysis. In the calculation of condition 1 trip at the largest generator LU 01 and the smallest LU 02 the frequency was declared to be stable and steady state again at frequencies of 59.25 Hz and 59.92 Hz. Then in the calculation of Condition 2 trips at the largest generator LU 01 and smallest LU 02, Load shedding if a trip of generator LU 01 occurs only 2.5 seconds and in the smallest generator LU 02 the load is removed at a frequency of 57.01 Hz at 2.9 seconds . So it can be concluded PLC-Based Load shedding at PT. Medco Rimau Asset can almost be said to be good because from the calculations carried out there is no frequency below the nominal frequency (5% of the normal frequency of 60 Hz).


Availability
Inventory Code Barcode Call Number Location Status
2107003323T432912T432912021Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T432912021
Publisher
Inderalaya : Prodi Teknik Elektro, Fakultas Teknik Universitas Sriwijaya., 2021
Collation
xvi, 76 hlm,: ilus.; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
621.319 07
Content Type
Text
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Transmisi dan distribusi listrik
Prodi Teknik Elektro
Specific Detail Info
-
Statement of Responsibility
MURZ
Other version/related

No other version available

File Attachment
  • EVALUASI PELEPASAN BEBAN POWER PLANT B KAJI STATION PADA PT. MEDCO E&P RIMAU ASSET
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search