Image of RANCANGAN PIT UNTUK MENENTUKAN JUMLAH OVERBURDEN DAN BATUBARA SERTA BIAYA OPERASIONAL PENAMBANGAN DI PT TAMBANG BUKIT TAMBI, BATANGHARI, PROVINSI JAMBI

Skripsi

RANCANGAN PIT UNTUK MENENTUKAN JUMLAH OVERBURDEN DAN BATUBARA SERTA BIAYA OPERASIONAL PENAMBANGAN DI PT TAMBANG BUKIT TAMBI, BATANGHARI, PROVINSI JAMBI

Pratama, Palpin Oki - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT Tambang Bukit Tambi is a company engaged in the coal mining business. The increasing demand for coal also requires careful planning by considering technical and economic aspects so that production achievements can be met. This study aims to design a safe pit in order to calulate the volume of overburden and tonnage of coal that will be produced and to calculate the required mining operational costs. The study was conducted by observing mining activities to obtain cycle time data then designing pits using AutoCAD Civil 3D 2017 software, calculating the total of overburden and coal using Surpac 6.6.2 software, and calculating mining operational costs until overburden and coal were excavated. From the study results, it was found that the pit design criteria were 2 meters wide, 5 meters high, 70º single slope, and 55° overall slope. The number of levels produced at the lowest coal elevation is 6 levels with a total height of 28 meters and 2 levels with a total height of 7 meters. The number of levels produced at the highest topographical elevation and the highest coal elevation is 6 levels with a total height of 23 meters and 2 levels with a total height of 7 meters. Based on the calculation, the overburden volume obtained was 1.828.155,23 BCM with a stripping time of 12,18 months, and the coal tonnage obtained was 917.789,32 tonnes with a life of mine 11,47 months. The total mining operational cost required is IDR 36.666.946.747.


Availability
Inventory Code Barcode Call Number Location Status
T50834S00003T508342021Central Library (REFERENCES)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T508342021
Publisher
Inderalaya : Prodi Teknik Pertambangan, Fakultas Teknik Universitas Sriwijaya., 2021
Collation
xv, 44 hlm. : ilus. ; 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
333.807
Content Type
Text
Media Type
unmediated
Carrier Type
unspecified
Edition
-
Subject(s)
Prodi Teknik Pertambangan
Sumber Daya Alam di Bawah Permukaan Tanah
Segi Ekonomi
Specific Detail Info
-
Statement of Responsibility
Win
Other version/related

No other version available

File Attachment
  • RANCANGAN PIT UNTUK MENENTUKAN JUMLAH OVERBURDEN DAN BATUBARA SERTA BIAYA OPERASIONAL PENAMBANGAN DI PT TAMBANG BUKIT TAMBI, BATANGHARI, PROVINSI JAMBI
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search