Skripsi
PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA SECARA MANDIRI DAYA 2200 VA RUMAH TINGGAL
Electrical energy is one of the most important and vital needs of modern society. The absence of electrical energy will greatly disrupt the sustainability of human activities. Therefore, the continuity and availability of electrical energy needs to be maintained at all times. Indonesia's current electrification ratio is 87%, which shows 8.5 million Indonesians or the equivalent of 2500 villages that have not yet had electricity. Indonesia's geographic location is one of the reasons why there are still many areas that are not reached by the State Electricity Company (PLN) such as Selaru Island at the southern tip of West Southeast Maluku district. Indonesia is a tropical country that has the potential for solar energy with an average daily insolation of 4.5 - 4.8 kWh / m2 / day. So that solar energy becomes a potential renewable energy source to be developed in Indonesia. PLTS in this study is planned to independently meet the electricity needs of a residential house that will be used day and night. The type of dwelling used is type 36, with an estimated total daily power requirement of 2876 Wh. The solar panels used produce 300 Wp of power. With the assumption of I day without sunlight, the initial investment cost for this independent residential PLTS is Rp. 101,446,000 and the annual fee for PLTS for 25 years is Rp. 11,637,840. Keywords: PLTS, electrification, investment
Inventory Code | Barcode | Call Number | Location | Status |
---|---|---|---|---|
2107002875 | T64463 | T644632021 | Central Library (Referens) | Available but not for loan - Not for Loan |
No other version available