The Sriwijaya University Library

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Login
  • Member Area
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject ISBN/ISSN Advanced Search

Last search:

{{tmpObj[k].text}}
Image of PERENCANAAN PENGELOLAAN LINGKUNGAN TAMBANG BATUAN ANDESIT DI PT. BUKIT ASAM TBK. TANJUNG ENIM, SUMATERA SELATAN

Text

PERENCANAAN PENGELOLAAN LINGKUNGAN TAMBANG BATUAN ANDESIT DI PT. BUKIT ASAM TBK. TANJUNG ENIM, SUMATERA SELATAN

Arsana, Moh. Diva - Personal Name;

Penilaian

0,0

dari 5
Penilaian anda saat ini :  

PT. Bukit Asam Tbk Tanjung Enim Mining Unit (UPTE) is a state-owned company (BUMN) engaged in mining. Planning is the determination of the goals and objectives of the activities to be achieved. In andesite mining in quarry mines, there is no overburden due to hilly soil conditions, which are mostly formed by accumulated rocks to form hills. Therefore, it is necessary to plan and study things that are useful for preparing land so that the reclamation process can be successful. These include land use, revegetation, and appropriate costs for reclamation in areas after andesite mining (according to the Minister of Energy and Mineral Resources Decree No. 1827K / 30 / MEM 2018). The research method used is by combining data between theory and data in the field so that evaluation results and solutions will be obtained in solving problems. The days required for this reclamation planning are 69 days, or 2 months and 1 week for its implementation. The total cost required to reclaim the post-mining area which has an area of 3.6 ha is Rp. 343.243.711 with a total direct cost of Rp. 257.111.396 and indirect costs of Rp. 86.132.315. Reclamation planning in the post-mining area is based on the following considerations. Arrangement of the soil surface, determination of topsoil volume, sowing of topsoil, construction of drainage channels, revegetation, and maintenance. Direct costs in planning reclamation are divided into costs for land use and costs for revegetation and maintenance.


Availability
Inventory Code Barcode Call Number Location Status
2107002800T43926T439262021Central Library (Referens)Available but not for loan - Not for Loan
Detail Information
Series Title
-
Call Number
T439262021
Publisher
Inderalaya : Prodi Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya., 2021
Collation
xv, 91 hlm,: ilus,: 29 cm
Language
Indonesia
ISBN/ISSN
-
Classification
622.307
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Prodi Pertambangan
Pertamabngan Batu bara
Specific Detail Info
-
Statement of Responsibility
SEPTA
Other version/related

No other version available

File Attachment
  • PERENCANAAN PENGELOLAAN LINGKUNGAN TAMBANG BATUAN ANDESIT DI PT. BUKIT ASAM TBK. TANJUNG ENIM, SUMATERA SELATAN
Comments

You must be logged in to post a comment

The Sriwijaya University Library
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2025 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search